Confirm the last usable point
Check the last completed recovery point and its verification status. A recent job name or a successful notification does not establish that you can restore it. Note the age of the last point that has meaningful evidence behind it.
Investigate the failure
Common operational categories include quota, credentials, connectivity, scheduling and changed source paths. Use the provider’s supported diagnostics and preserve useful logs privately. Do not delete the only known good backup simply to free space for a new attempt.
Update the business assumption
The tool’s interval-plus-duration example assumes every job succeeds. A missed run breaks that assumption. State the current exposure to the responsible owner and decide whether a supported on-demand backup or other protective action is appropriate. Avoid promising an exact data-loss amount from a schedule alone.
Verify the fix
A new successful job is useful, but test that its scope includes the changed data and that the restore method still works. Record the cause, correction and verification date. Add monitoring that reaches an accountable person. Recovery planning is a continuing operational process; the useful outcome is a known usable point and a tested way back.